14 Things Your Reserve Analysts Might Not Tell You – And It’s Not Their Fault (Part 2)

Last week’s blog offered five focus points to improve the accuracy of your reserve plan. Nuggets 1 through 5 help you analyze property components. This week, we share nuggets 6 through 10. These are practical considerations to discuss with your reserve analysts in order to estimate project expenses as accurately as possible.

These all come from my experience working with clients through the years. In some cases, I noticed a disconnect between plan and execution. In their planning process they dutifully used the expense listed in their reserve study. However, once the project got going, additional necessary expenses that were not anticipated in the study were funded from replacement reserves. This made it appear that the projects were over budget, resulting in weeping and gnashing of teeth, not to mention death glares in the direction of their reserve analysts. The truth was that these projects were not over budget, rather they were under planned. In other cases, under planning occurred when clients failed to take a bigger picture or strategic approach to planning projects. The lesson is clear: The more accurately you can see the future, the better the odds you can get there.

Clients who implemented this week’s nuggets planned more realistically and utilized reserve funds to the maximum benefit.

6.  Project Design & Management Expenses: Wise associations elect to engage professional engineers, architects, and/or project management firms to develop specifications, facilitate the bidding process, and provide quality control for major capital projects. Depending on the nature and size of project, the investment can be in the neighborhood of allowing 10% to 15% of the total project costs.

Lately I’ve been encouraged to work with boards that understand the impact of major projects on their management team. Projects that impact residents in an intense way take human resources to make sure they run smoothly. Hiring additional staff or a professional project manager can make all the difference between a great project and one that sucks the life out of every resident, board member, and team member. Too many associations ignore the fact that without that support, something will give – the quality of the project, the quality of day-to-day operations, or both.

Reserve studies may not anticipate any of these expenses. You may need to direct that they be included.

7.  Logistics for Limited Access Projects: If something is hard to access, it’s going to be more expensive to replace or maintain. Sometimes A LOT more expensive. Getting a handle on those costs can be crucial to estimating the total price tag of a project. A cooling tower on top of a 27-story high rise is going to cost exponentially more than one on the ground floor. If a building elevation presents challenges in accessing a roof, the costs of roof or gutter replacement and periodic major maintenance on components like soffits and trim go way up. Contractors and construction estimators can be lifesavers in helping to avoid some gnarly surprises.

8.  Collateral Damage: This can be a tricky one. Technically, the association may have limited or no responsibility for replacing unit components. But what if they are altered to access common element replacements like pipe risers? My favorite example to illustrate the point: Let’s say the only way to replace a piping system is to go through 1950’s era ceramic tile. You’ll never match the old tile. Will the Board repair the plaster only? Tile one mismatching wall? Or replace all the tile in the unit? Multiply the expense by all the units in that tier. The answer might make a significant impact on project costs. Here, your first call may be to association counsel to be clear on your responsibilities and options. Then you’ll have to make a business judgment. Just don’t wait until you start the project to decide. Get clarity in the planning process and plug the info into the reserve study. That is not your reserve analyst’s responsibility, it’s the Board’s.

9.  Items Outside Study Period: Many studies include only those components that have useful lives within the period of the study (usually 30 years). The rationale is that if you conduct studies every three to five years, the component will eventually make its way into the study. But some major components such as electrical switchgear, transformers, or piping systems may have useful lives of 50 years or more and they may be major expenses. Waiting to fund those expenses over only 30 years could create a big bump in required funding levels when they magically appear in the study. Plug them in now.

10.  Strategic Improvements: Instead of replacing components in kind, it might make sense to rethink and plan. For instance, a property may have high-maintenance components such as wooden exterior soffits, fascia, and rake boards. These require repainting every few years and eventually sectional or full replacement. It might make sense to replace them with low-maintenance materials. More expensive up front, but much less expensive in the long run. Original gutters might have been undersized and should be replaced with larger ones. If gutters and downspouts are being replaced, it might be the golden opportunity to replace wood trim with low-maintenance material. The Association could pay only once for mobilization for two projects and save money in the long run. Better yet – think strategically and tie these projects in with the next roof replacement to get to best bang for the buck. Take a step back and see property components in a broader context. Adjust the plan accordingly and make sure the data gets plugged into the reserve study.

Perspective

No one wants to increase fees. It can be tempting to ignore the potential for additional expense, even if it means losing out on savings in the long run. Making the best use of members’ assets is a key element of the board’s fiduciary duty. Think strategically, plan wisely.

“Leaders keep their eyes on the horizon, not just on the bottom line” –Warren Bennis

Next…

Next week we close out this series with the last 4 nuggets. These will help you to recognize areas where the board has a great deal of discretion in the planning process. Many community associations are facing the tough realities of under funding and have to include options such as loans and special assessments in their funding plan. We will help you to partner with your reserve analysts and other professionals to develop scenarios and choose the best plan for your community.

Leave a Reply

Your email address will not be published. Required fields are marked *