Category Archives: Strategic Planning

O Say Can You See?

“Tom, aren’t there any good management companies out there?”

That was the question posed to me by a condominium association board member circa 1988. I was in my formative years in the management business. That client knew me in my first incarnation of self-employment. I had completed a very successful plastering and painting project. I had only begun to venture into part-time, on-site management services the year before. That one question helped me to crystallize an Aha! Concept. Let me explain.

The Devil’s In The Details

I really enjoyed working with this group, even though they were rather “high maintenance.” They were enthusiastic, dedicated, and genuinely nice folks. They had an older building, the logistics of which amplified the inequity of scale faced by most small associations. They had a central HVAC plant to serve less than 30 units. The units were large and spread through only four stories, so even the cost per unit for roof maintenance and eventual replacement was much higher than most buildings.

There were other factors that added to this condominium’s challenges. Most units were owner-occupied. There was a seven person board, and there were several active committees. In a way, this was the perfect condominium – it seemed like every unit owner was involved! But this led to an unintentional consequence. At only 20+ units, they didn’t seem to justify much of an on-site maintenance or management presence. All that active participation meant that volunteers were in the details of every facet of the operation, which led to innumerable questions and a desire for fast and detailed response. Off-site “cost-effective” management and engineering services were always going to be reactive. This group was never going to be satisfied with the status quo. I knew a little about the history of that condominium, and knew they had already fired most of the companies I would have recommended at the time.

The Aha! Concept – System or Performance?

I’ll always remember this client because it helped me to formulate a frame of reference that became a core issue for much of my consulting work ever since. I noticed that most boards defaulted to a common position when something was wrong. They tended to conclude that they were getting lousy results because somebody wasn’t doing their job. This was one of the first clients to help me realize that you have to figure out if you’ve got a system problem, a performance problem, or a combination of the two. Until you figure that out, you are always answering the wrong question. It is unlikely you will get the results you seek. My 1988 client needed to find a way to get more proactive attention (and pay more), or lower their expectations. Status quo approaches were never going to give them what they wanted.

It’s Not Easy

It can be tough for volunteers serving on a board to see things clearly to determine the root of their dissatisfaction. There are a myriad of potential reasons why.

  • It’s not their full-time job. They may lack the time or expertise needed to accurately diagnose the situation.
  • They may be too close to the situation to see it clearly.
  • They may have been fortunate to have had an excellent manager or other service providers who regularly exceeded the specifications of their agreements. Great performance can mask a deficient system. God help the next good, but not great, manager…
  • They may be resistant to the idea that it might cost a little more to get what they need, exacerbated by a market flooded by management companies inclined to over promise and roll the dice.
  • They may not recognize that all associations have life cycles. The systems that met yesterday’s expectations may not be able to handle today’s realities, much less tomorrow’s. Of if only I had a dime for every time I heard “Well we’ve done just fine with x for the last ten years, we shouldn’t need it now.”
  • There may not be many free thinkers out there prepared to offer creative solutions, or companies geared up to offer those customized services, especially to a smaller association.

Fresh Eyeballs

It may be time to take a fresh look. Seek out and listen to innovative ideas. Take advantage of opportunities to network with other volunteer leaders. See if your city, county or state facilitates programs for board members. The Community Associations Institute is an excellent resource for any community association. CAI Press includes a hugely diverse library of material. Professionals in the field and volunteers contribute articles and educational seminars through CAI National and local chapters. An underutilized feature of CAI membership for volunteers is the networking aspect that is available through participation in local and national programs

If nothing seems to be working, don’t give up or settle. Maybe most importantly…don’t assume. Dig a little deeper. Look a little harder. You might just find what you really need.

14 Things Your Reserve Analysts Might Not Tell You – And It’s Not Their Fault (Part 3)

Two weeks ago,,  we shared five focus points to help you analyze property components. Last week, we offered another five, which were practical considerations to discuss with your reserve analysts in order to estimate project expenses as accurately as possible. To recap, we’ve covered:

1. Engineering Study for Stuff You Can’t See
2. Elements Impacted by Code Compliance
3. Piping Systems
4. New Construction Technology
5. Underground Piping and Wiring
6. Project Design & Management Expense
7. Logistics for Limited Access Projects
8. Collateral Damage
9. Items Outside Study Period
10. Strategic Improvements

We close out the series with the last four nuggets. These cover areas where the Board has a level of discretion and help you deal with some thorny cash flow issues.

11. Interior Renovation Upgrades: Interior renovations can take many forms. If you don’t tell your analysts what you have in mind, they are left to guess. For instance, I helped one client to plan for wallcovering, painting and lighting that would last through two cycles of carpet. In another case, the whole lighting plan was to be revised. That specific data had to be plugged into the reserve study.

12. Alternative Funding Options: If the community is behind the ball financially, debt service, special assessments, or a combination of the two might be options to consider. Clarifying the Board’s authority to do either and strategically planning to communicate options to members are absolutely crucial. This will no doubt be the subject of a future blog. Your reserve analysts should be able to help you to run “what if” scenarios, but you are going to have to tell them what those options might be.

13. Big Trees, Drainage & Other Landscaping: I’ve heard arguments that greenspace does not belong in reserve studies. However, mature trees and landscaping can be really expensive to remove, not to mention replace. Over time, surface drainage can become ineffective and might even lead to flooding. A review by an arborist, landscape designer or architect can be a real eye-opener. You can consult with your reserve analyst and auditor to confirm the appropriateness of including such items in the replacement reserve. If it gives either of them heartburn, you have an option. See #14 below.

14. Major Periodic Maintenance: I regularly see five-year electrical panel and switchgear maintenance in reserve studies. I even see the cost for future reserve studies in some reserve schedules. Even though these expenses may not pass the test as a reservable component, it makes sense to flow the funding evenly from year to year. Including such expenses in the operating budget could have significant impacts on fees. The fact that it’s on a schedule and in the financial plan helps Boards to maintain the discipline to actually tackle these vital projects. Depending on the property there might be other major periodic maintenance that is just as vital and has a similar financial impact. Hydro-jetting of plumbing stacks and laterals, dryer duct/vent cleaning, HVAC duct cleaning, and chimney inspections and cleaning can add up. There may be a couple of approaches to consider. If the property can be divided up with a portion of the work done each year, it would flatten out the expense. But if that’s not feasible, you might ask the reserve analyst to include such projects in the study. If the analyst (or the auditor as noted in #13) or the Board is uncomfortable with that approach, there is an option. You can create an operating reserve, set up a schedule of expenses, and calculate a monthly contribution to that reserve in the same manner as the replacement reserve. This will make sure the money is in the bank, keep you from deferring critical preventive maintenance, and even out the financial impact on association members.

Who & When?

We’ve identified a number of capital projects that may require additional professional support to properly plan and estimate replacement costs. Investing funds up front to work with a qualified, structural engineer, mechanical engineer, construction manager, construction estimator, project manager, elevator expert, fire protection system engineer, architect, or contractor can significantly mitigate the possibility of unhappy surprises and create a realistic funding plan. We’ve identified a few areas where legal and audit advice is advisable. Making this a point of discussion with your reserve analyst will help. Some firms that provide reserve studies are multi-disciplinary and may have some of these resources in-house.

The optimal time and depth of study will depend on the projects themselves. Hopefully this series has helped you to take a hard look at the components in your reserve schedule, do a risk analysis and take the holistic approach described in last week’s blog. Once you’ve identified elements that may benefit from further analysis, check the timing. Early on, perhaps you can get some inexpensive thumbnail estimates (hint – plan for the worst, guess high). If you are getting to within about five years of a large project, it might be time to make a more significant investment and hire specialists to take a deeper look. The more complicated the project, the more important this is.

Bottom Line

A truly comprehensive reserve plan can make all the difference in the financial health of a community association and the quality of life of its members. The reserve study is a tool. Your reserve analysts are your partners. See the bigger picture. The better the data, the better the study. The better the study, the better the plan. The better the plan, the better the execution of the plan. The better the execution of the plan, the better the community.

14 Things Your Reserve Analysts Might Not Tell You – And It’s Not Their Fault (Part 2)

Last week’s blog offered five focus points to improve the accuracy of your reserve plan. Nuggets 1 through 5 help you analyze property components. This week, we share nuggets 6 through 10. These are practical considerations to discuss with your reserve analysts in order to estimate project expenses as accurately as possible.

These all come from my experience working with clients through the years. In some cases, I noticed a disconnect between plan and execution. In their planning process they dutifully used the expense listed in their reserve study. However, once the project got going, additional necessary expenses that were not anticipated in the study were funded from replacement reserves. This made it appear that the projects were over budget, resulting in weeping and gnashing of teeth, not to mention death glares in the direction of their reserve analysts. The truth was that these projects were not over budget, rather they were under planned. In other cases, under planning occurred when clients failed to take a bigger picture or strategic approach to planning projects. The lesson is clear: The more accurately you can see the future, the better the odds you can get there.

Clients who implemented this week’s nuggets planned more realistically and utilized reserve funds to the maximum benefit.

6.  Project Design & Management Expenses: Wise associations elect to engage professional engineers, architects, and/or project management firms to develop specifications, facilitate the bidding process, and provide quality control for major capital projects. Depending on the nature and size of project, the investment can be in the neighborhood of allowing 10% to 15% of the total project costs.

Lately I’ve been encouraged to work with boards that understand the impact of major projects on their management team. Projects that impact residents in an intense way take human resources to make sure they run smoothly. Hiring additional staff or a professional project manager can make all the difference between a great project and one that sucks the life out of every resident, board member, and team member. Too many associations ignore the fact that without that support, something will give – the quality of the project, the quality of day-to-day operations, or both.

Reserve studies may not anticipate any of these expenses. You may need to direct that they be included.

7.  Logistics for Limited Access Projects: If something is hard to access, it’s going to be more expensive to replace or maintain. Sometimes A LOT more expensive. Getting a handle on those costs can be crucial to estimating the total price tag of a project. A cooling tower on top of a 27-story high rise is going to cost exponentially more than one on the ground floor. If a building elevation presents challenges in accessing a roof, the costs of roof or gutter replacement and periodic major maintenance on components like soffits and trim go way up. Contractors and construction estimators can be lifesavers in helping to avoid some gnarly surprises.

8.  Collateral Damage: This can be a tricky one. Technically, the association may have limited or no responsibility for replacing unit components. But what if they are altered to access common element replacements like pipe risers? My favorite example to illustrate the point: Let’s say the only way to replace a piping system is to go through 1950’s era ceramic tile. You’ll never match the old tile. Will the Board repair the plaster only? Tile one mismatching wall? Or replace all the tile in the unit? Multiply the expense by all the units in that tier. The answer might make a significant impact on project costs. Here, your first call may be to association counsel to be clear on your responsibilities and options. Then you’ll have to make a business judgment. Just don’t wait until you start the project to decide. Get clarity in the planning process and plug the info into the reserve study. That is not your reserve analyst’s responsibility, it’s the Board’s.

9.  Items Outside Study Period: Many studies include only those components that have useful lives within the period of the study (usually 30 years). The rationale is that if you conduct studies every three to five years, the component will eventually make its way into the study. But some major components such as electrical switchgear, transformers, or piping systems may have useful lives of 50 years or more and they may be major expenses. Waiting to fund those expenses over only 30 years could create a big bump in required funding levels when they magically appear in the study. Plug them in now.

10.  Strategic Improvements: Instead of replacing components in kind, it might make sense to rethink and plan. For instance, a property may have high-maintenance components such as wooden exterior soffits, fascia, and rake boards. These require repainting every few years and eventually sectional or full replacement. It might make sense to replace them with low-maintenance materials. More expensive up front, but much less expensive in the long run. Original gutters might have been undersized and should be replaced with larger ones. If gutters and downspouts are being replaced, it might be the golden opportunity to replace wood trim with low-maintenance material. The Association could pay only once for mobilization for two projects and save money in the long run. Better yet – think strategically and tie these projects in with the next roof replacement to get to best bang for the buck. Take a step back and see property components in a broader context. Adjust the plan accordingly and make sure the data gets plugged into the reserve study.

Perspective

No one wants to increase fees. It can be tempting to ignore the potential for additional expense, even if it means losing out on savings in the long run. Making the best use of members’ assets is a key element of the board’s fiduciary duty. Think strategically, plan wisely.

“Leaders keep their eyes on the horizon, not just on the bottom line” –Warren Bennis

Next…

Next week we close out this series with the last 4 nuggets. These will help you to recognize areas where the board has a great deal of discretion in the planning process. Many community associations are facing the tough realities of under funding and have to include options such as loans and special assessments in their funding plan. We will help you to partner with your reserve analysts and other professionals to develop scenarios and choose the best plan for your community.